Summary
The Overall system test report describes the preparation, execution and results of the overall system test which is part of the AIT. The performance of each subsystem and the overall system is described. Furthermore, subsystem failures will be documented and when possible new design solutions elaborated.
TAS-I will contribute to the overall system test report for the test segment dedicated to the ISPR cultivation system. The report will include: the results of post-processing of data monitoring of ISPR system performance during validation, telepresence/assistance reports of on-site ISPR system adjustments, repairing and components exchange during intermediate shut down, eventual failure analysis.
TPZ, HS, UoG, and AS will contribute to the overall system test report through the report produced by their personnel onsite during the overall system AIT.