T62 Assembly of the pilot lines CHALM FAU POLITO EOS OSAI IVFDeveloped in the WP4 tailored AM processes EBM and LPBF T41 and online monitoring systems will be assembled As described above some online monitoring systems require significant development of the process parameters that are determined by material and component design Full assembly of the both EBM and LPBF processes with the intended online monitoring systems will be performed Further in case of LPBF set of the online monitoring tools will be selected based on the material and complexity of the usercase component Manufacturing lines will be adapted to the most desirable material between different use cases at the beginning of the pilot line testing Further change in material of interest will be performed in accordance to the plan established in WP2