Summary
This report is the outcome of consolidation of four survey reports conducted by ENERC in cooperation with each pilot responsible (TINYM, HITS, MPC). The pilots’ surveying general report will feature a standard template for all the sites in order to document stakeholder interviews, operational requirements of each site, the analysis of contingencies and expected results, and to list specifications of the installed systems and equipment, as well as provide a technical description of functionalities with corresponding devices and/or microgrid equipment to be adopted to IoT. The report might incorporate additional operation requirements after discussion within the consortium; in case information gaps or additional needs are identified gap analysis document would be prepared. A comparative requirements’ matrix for future replicable package creation of optimized sites surveys for operational requirements will be created.
Create knowledge management exchange between the pilot’s sites, including stakeholder’s engagement processes. Create a comparative requirements matrix for future replicable package creation of optimized sites surveys for operational requirements.
More information & hyperlinks