Report on development and optimisation of SOEC system for production and use of DME

Summary
The report (to be compiled by both SP and ICI) will present the outcome of Task 3.3 dealing with the integration of the SOEC co-electrolysis stack in order to operate it at 3.5 kW under the conditions representative of the pilot DME production. The design of this testing piece of equipment will be based on the requirements (parameters) and prior work provided from WP2. The composition of the output gases will be analysed in order to evaluate its suitability for DME production.