Summary
D1.1 will summarize the results of the scenarios, KPIs and spectrum investigations carried out in T1.1 and T1.2. Two versions of the document will be prepared:
• version 1.0 (CO): to be used as input to WP2, WP3, WP4, WP5, WP6 (M01).
• version 2.0 (PU): to be presented at meeting with Advisory Board (M05).
More information & hyperlinks