Summary
This deliverable will strive to consider and integrate as necessary the technical components and design requirements as provided by all partners contributing to the technical design specifications of the IPSE as part of WP3. It will also consider the use case scenario requirements and reflect them in the technical design specifications and topology for the IPSE prototype development to facilitate a “bottom up/top down” parallel approach to the iterative design process. Two versions of each IPSE components will be developed: One version (v1) by M12 and an upgraded version (v2) after the technology has been evaluated in the first phase of Living Labs by M26 (D3.6).
More information & hyperlinks