Mapping against scope, specification of technical enablers, high-level use cases, high-level requirements, high level design for demonstrators in WPs 11-18

Summary
This report is based on the input of Tasks 10.1 and 10.2. It report identifies sources in previous international projects dealing with TMS development and integration and the trends of the market for such type of projects. Based on the needs of WPs 11, 13, 15, 17, the high-level use cases for future TMS enhancements are presented. And then, based on those and on the assigned requirements, high-level designs for each demonstrator are also shown.