DEMOTIDE | DEMOnstration for Tidal Industry DErisking

Summary
The European tidal industry is at a critical stage. Successful demonstration of small-scale tidal arrays with lessons learnt for future large-scale projects is widely acknowledged as a key way to de-risk and kick-start the tidal energy industry. The DEMOTIDE project will design, build and operate a 4 x 1.5MW (6MW) turbine array at the MeyGen Phase 1B site, Pentland Firth, Scotland. The potential for build-out on the MeyGen site to 400 MW installed capacity, based on the available local high flow tidal resource, make this a site ripe for commercial exploitation. The DEMOTIDE consortium unites strong players with each of the required competencies to deliver this array. Leading technology supplier Marine Current Turbines (an Atlantis company) can rely on experience gained from operating its SeaGen tidal turbine system for several years. The participation of both MCT and Atlantis technology development teams is crucial to deliver robust, efficient turbines, fully specified to perform in challenging tidal site conditions.
Effective installation plans are only possible through early involvement of an experienced marine contractor. DEME, comprising DEME Blue Energy and GeoSea, is a world leader in marine operations and owns a versatile fleet (jack-up platforms, DP, heavy-lift, barges, etc.) which can be applied to the tidal market. DEME subsidiary GeoSea will bring extensive offshore wind energy installation experience to the table. The combined involvement of DEME Blue Energy, Atlantis Resources, and French partner INNOSEA provides a strong route to exploitation of the results of DEMOTIDE across a portfolio of commercial tidal energy projects throughout Europe and abroad. Finally, local content and dissemination of the project results is ensured through involvement of Queen’s University Belfast and local contractors in Scotland for onshore works.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/691925
Start date: 01-01-2017
End date: 31-12-2020
Total budget - Public funding: 47 999 416,75 Euro - 20 301 149,00 Euro
Cordis data

Original description

The European tidal industry is at a critical stage. Successful demonstration of small-scale tidal arrays with lessons learnt for future large-scale projects is widely acknowledged as a key way to de-risk and kick-start the tidal energy industry. The DEMOTIDE project will design, build and operate a 4 x 1.5MW (6MW) turbine array at the MeyGen Phase 1B site, Pentland Firth, Scotland. The potential for build-out on the MeyGen site to 400 MW installed capacity, based on the available local high flow tidal resource, make this a site ripe for commercial exploitation. The DEMOTIDE consortium unites strong players with each of the required competencies to deliver this array. Leading technology supplier Marine Current Turbines (an Atlantis company) can rely on experience gained from operating its SeaGen tidal turbine system for several years. The participation of both MCT and Atlantis technology development teams is crucial to deliver robust, efficient turbines, fully specified to perform in challenging tidal site conditions.
Effective installation plans are only possible through early involvement of an experienced marine contractor. DEME, comprising DEME Blue Energy and GeoSea, is a world leader in marine operations and owns a versatile fleet (jack-up platforms, DP, heavy-lift, barges, etc.) which can be applied to the tidal market. DEME subsidiary GeoSea will bring extensive offshore wind energy installation experience to the table. The combined involvement of DEME Blue Energy, Atlantis Resources, and French partner INNOSEA provides a strong route to exploitation of the results of DEMOTIDE across a portfolio of commercial tidal energy projects throughout Europe and abroad. Finally, local content and dissemination of the project results is ensured through involvement of Queen’s University Belfast and local contractors in Scotland for onshore works.

Status

TERMINATED

Call topic

LCE-03-2015

Update Date

26-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.3. SOCIETAL CHALLENGES - Secure, clean and efficient energy
H2020-EU.3.3.0. Cross-cutting call topics
H2020-LCE-2015-2
LCE-03-2015 Demonstration of renewable electricity and heating/cooling technologies
H2020-EU.3.3.2. Low-cost, low-carbon energy supply
H2020-EU.3.3.2.0. Cross-cutting call topics
H2020-LCE-2015-2
LCE-03-2015 Demonstration of renewable electricity and heating/cooling technologies
H2020-EU.3.3.2.1. Develop the full potential of wind energy
H2020-LCE-2015-2
LCE-03-2015 Demonstration of renewable electricity and heating/cooling technologies
H2020-EU.3.3.2.2. Develop efficient, reliable and cost-competitive solar energy systems
H2020-LCE-2015-2
LCE-03-2015 Demonstration of renewable electricity and heating/cooling technologies
H2020-EU.3.3.2.4. Develop geothermal, hydro, marine and other renewable energy options
H2020-LCE-2015-2
LCE-03-2015 Demonstration of renewable electricity and heating/cooling technologies