ASTRASY | Avantis STructural Rod Adjustment SYstem

Summary
The aim of the project is to design, define, realize and test one prototype of adjustable length structural rods that can withstand high loads encountered in the aeronautical field.
Two overall concepts will be studied and one of them will be retained for the prototype.
First solution consist to reinforce existing adjustable rods locally by welding titanium threaded inserts in order to support high loads and avoid fatigue problems.
The second solution consists to invent a welded assembly method and the associated tool in order to complete the manufacture of rods on the aircraft during integration phase.
During this project, the AVANTIS Company, specialized in innovative aeronautical design and ARMINES laboratory will take the required measures to evolve from first ideas to the final demonstrator and to upgrade the technology readiness level (TRL) from 2 to 4.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/785289
Start date: 01-03-2018
End date: 29-02-2020
Total budget - Public funding: 534 301,25 Euro - 399 490,00 Euro
Cordis data

Original description

The aim of the project is to design, define, realize and test one prototype of adjustable length structural rods that can withstand high loads encountered in the aeronautical field.
Two overall concepts will be studied and one of them will be retained for the prototype.
First solution consist to reinforce existing adjustable rods locally by welding titanium threaded inserts in order to support high loads and avoid fatigue problems.
The second solution consists to invent a welded assembly method and the associated tool in order to complete the manufacture of rods on the aircraft during integration phase.
During this project, the AVANTIS Company, specialized in innovative aeronautical design and ARMINES laboratory will take the required measures to evolve from first ideas to the final demonstrator and to upgrade the technology readiness level (TRL) from 2 to 4.

Status

CLOSED

Call topic

JTI-CS2-2017-CFP06-AIR-02-44

Update Date

26-10-2022
Images
No images available.
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
Horizon 2020
H2020-EU.3. SOCIETAL CHALLENGES
H2020-EU.3.4. SOCIETAL CHALLENGES - Smart, Green And Integrated Transport
H2020-EU.3.4.5. CLEANSKY2
H2020-EU.3.4.5.4. ITD Airframe
H2020-CS2-CFP06-2017-01
JTI-CS2-2017-CFP06-AIR-02-44 Adjustable high loaded rod